NHS Shared Business Services
Managing £800m of spend annually and 1,536 approved organisations, the SBS Framework is free to access to both the NHS and the wider public sector, with their comprehensive portfolio of framework agreements providing typical savings of c.15%.
Pagabo Professional Services Framework
Supports the quick and easy procurement of the right consultants and professional services for public sector projects of any value, both large and small. Simple, flexible and fully compliant, the framework includes 75 carefully selected providers, split across 19 different lots and 7 regional areas. Client’s can either appoint a single national provider using Lot 1, or individually through Lots 2-19.
20 Ropemaker Street
London
This new commercial building is set to bring more than 415,000ft2 of Grade A, BREEAM ‘Excellent’ office space to the City of London, plus premium retail provision.
Midland Metropolitan Hospital
Smethwick
A new acute general hospital being built on a 16 acres (6.5 hectares) site in Grove Lane at Smethwick near Birmingham.
Mapleton Crescent
Wandsworth, London
A new residential tower comprising 89 apartments in a 27 storey tower of approximately 7,000m2 gifa alongside the River Wandle. The scheme comprises communal outdoor areas with secure space for bicycles.
Ely Leisure Village
Ely
The scheme comprised the design and construction a new six screen cinema and four in-line restaurants (A3/A4 use) and five additional units in A3/A5 use, together with an underpass, highway works, surface car park and landscaping (including a drainage attenuation pond and services).
Refurbishment of Imaging Department, Royal Free Hospital
London
The refurbishment of the Royal Free Hospital Imaging Department was executed in two phases/contracts.
The Royal Liverpool PFI
Liverpool
The project comprises the replacement of the existing life-expired Royal Liverpool Hospital with a new 96,000 m2 PFI development.
8 Salisbury Square
London
Major alterations and refurbishment of a 1980’s office building of circa 225,00 sq. ft. (160,000 sq. ft. net) of high-quality, flexible office space in a midtown location between Fleet Street and the Embankment.
48 Leicester Square
London
WT Partnership provided Cost Management, Employers Agent and Principal Designer services for this new development retaining the existing facades of the historic 1920’s landmark on Leicester Square.
The 02 Arena
London
A new standalone arena built within the existing Millennium Dome, providing a fully international standard multi-event centre which is the most technically and acoustically advanced concert venue in Europe.
Centre Point
London
WT Partnership are providing Cost Management and Employer’s Agent services for the redevelopment by Almacantar Limited of the Grade II listed, 34 storey Centre Point Tower in Oxford Street, London.
Channing School Sports Hall and Sixth Form Centre
London
WT Partnership provided Project Management / Employer’s Agent services for the construction of a new performing arts building, sixth form block and sports hall for Channing School for Girls in Highgate to enhance their existing sports and arts facilities.
Mandarin Oriental Hotel
London
Works comprise the refurbishment of this 200 bedroom landmark, luxury hotel in Knightsbridge.
Southside Shopping Centre
Wandsworth, London
The project comprised of the latest phase of shopping centre refurbishment including the extension of high street frontage and construction of 4 storey retail block to house department store, gymnasium and retail units.
Telford Shopping Centre
Shropshire
Telford Shopping centre is one of the largest covered centres in the UK spanning 70 acres, comprising of more than 170 units and car parking for 3,600 vehicles.
Redevelopment of the Royal Albert Dock
London
The project involves the regeneration of the 35-acre historic docklands site in South East London. Located in the heart of the Royal Docks Enterprise Zone, the Royal Albert Dock is set to undergo a £1.7bn makeover.
3 Minster Court
London
The scheme comprises the major refurbishment of an existing office building. WT Partnership is currently providing Cost Management and Principal Designer services.
Wrightington Elective Centre P21+
Wrightington
Wrightington Elective Care Centre is a new build 4000m2 Elective Care Centre in the North West consisting of a 4 barn theatre with supporting accommodation, staff areas and 2 wards.
Redevelopment of Heatherwood Hospital
The new hospital will include six operating theatres, 40 inpatient beds plus private patient spaces and 22 day case spaces and endoscopy facilities.
New Grandview
CATERHAM
Grandview is home to seven adults who have autistic spectrum conditions and receive residential support.
Extra Care and Dementia Care Housing, Brownlow Road
Mansfield
The Extra Care scheme is a new build development consisting of medium density, low rise, dispersed form of accommodation creating a village type development and is to comprise 64 dwellings as well as a communal block.
Scarborough Road
Bilsthorpe
This HCA Funded project provides 26 Supported Living Bungalows for over 55’s in Bilsthorpe Nottinghamshire.
Cleaver Court, Heswall
Wirral
Cleaver Court is a 44-bedroom high dependence residential dementia Care Home located in Heswall.














